Skip to main content.

Back to Web Site

City of St. Clair, Minnesota
Roots rich in history, living for today, branching out for tomorrow.

Zoning Permits

Zoning_23(1).png

  
ZONING PERMITS 
DEAL WITH LOT REQUIREMENTS 
 
Zoning Permits are oriented towards the LOT and how a proposed structure will be placed on the lot.  
 


Zoning Permits ensure compliance with regulations relating to setbacks, bulk/size, density, height, lot coverage, and and other lot requirements set forth in the City Zoning Ordinance. 
 
APPLICATION FORM ... Click on the link at the bottom of this page for a Zoning Permit Application.
 
Certain types of construction are not covered by the State Building Code and thereby do not require a Building Permit.  In those instances a Zoning Permit is necessary to determine if such construction will meet setbacks and other Zoning regulations. 



ZONING PERMITS ARE REQUIRED FOR:

  • Sheds (120 square feet or less)
  • Fences (six feet (6') in height or less)
  • Signs

Zoning Permits are approved by the City Council at a Regular City Council Meeting.
 


ZONING COMPLIANCE

In reviewing a Zoning Permit Application, the City Council determines if the project meets the performance standards, setbacks, and lot requirements set forth in the City Zoning Ordinance.


ZONING PERMIT FEE:  $50.00.


Attached Document or FileZONING PERMIT APPLICATION  





CITY OF ST. CLAIR

CALL BEFORE YOU DIG ... 811


City of St. Clair ~ Phone: 507-245-3494 ~ Fax: 507-245-3504 ~ E-mail: citystc@hickorytech.net